Monday, May 28, 2012

Memorial Day 2012

Memorial Day weekend in Montana was cold and...snowy. :(  That made for some indoor activities for the kids and me and plenty of time for CK to work on the house.


 CK has been a tiling maniac these past few weeks and the master bathroom is really looking good.  Reese, Asher and I took a trip to the house yesterday to inspect the progress.



 view from the doorway entering the bathroom; once you walk through that opening, the shower is on the right and the toilet on the left
 CK cut all the travertine from the larger 18" x 18" pieces



 this is the view from the loft looking down
 slightly different view, the flooring will be carpet/hardwood pretty soon
 and turning to your right looking down from the loft.  from left to right doorways- mudroom, steps downstairs to basement, steps upstairs to 2nd floor

 Dad, I can't quite climb this...yes, Asher, that was by design