Thursday, August 12, 2010

Braces Down

The concrete has been poured for the entire 1st floor and now the braces are off... 74 yards of concrete to fill the walls and one hectic day of work - thanks dad for all the help. below is a picture of the shop as you would see driving up the lower road to the house.

Here is a picture of the front of the house, the "missing" block is the location of the front door in the 2nd floor level - a deck and some backfill will make entering the house much easier.
Here is a view from the "backyard area - the center wall divides the shop (left) and the basement portion of the house (right). In the next few weeks I should have the first floor constructed.
Here is a picture of the house from the south (note the sleeping giant on the right horizon)